What to Expect During Your Solar Panel Installation

Solar Panel Installation Process

Deciding to install solar panels is an exciting step toward energy independence and sustainability. However, many homeowners are uncertain about what the installation process actually involves. This comprehensive guide walks you through each stage of a typical UK solar panel installation, from initial consultation to final commissioning, so you can prepare with confidence.

Phase 1: Consultation and Assessment

Before any physical installation begins, several important preparatory steps take place:

Initial Consultation

The process typically begins with an in-depth consultation to understand your energy needs, budget, and property characteristics. This may happen remotely or in-person and includes:

  • Discussion of your energy consumption patterns
  • Review of your electricity bills
  • Exploration of your goals (e.g., maximizing savings, energy independence, environmental impact)
  • Overview of available system options and technologies

Site Survey

A technical surveyor will visit your property to assess its suitability for solar installation. This crucial step typically takes 1-2 hours and includes:

  • Roof assessment (structure, age, orientation, and shading)
  • Measurement of available installation area
  • Evaluation of electrical infrastructure
  • Identification of optimal panel placement
  • Assessment of mounting options
  • Determination of inverter and battery storage locations (if applicable)

The surveyor may use specialized tools like solar pathfinders or digital modeling software to analyze sun exposure throughout the year.

System Design and Proposal

Following the site survey, you'll receive a detailed proposal including:

  • Recommended system size and configuration
  • Panel and equipment specifications
  • 3D mockups or visualizations of the installation
  • Projected energy generation
  • Financial details including costs, savings estimates, and payback period
  • Available incentives and financing options

This is your opportunity to ask questions, request adjustments, and finalize the system design before proceeding.

Phase 2: Pre-Installation Preparations

Once you've approved the proposal and signed a contract, several behind-the-scenes processes begin:

Permitting and Approvals

In the UK, various permissions may be required:

  • Planning Permission: Most domestic solar installations in the UK are considered "permitted development" and don't require planning permission, provided they meet certain criteria. However, exceptions apply for listed buildings, conservation areas, or panels that protrude significantly.
  • Building Regulations: Your installer will ensure the system meets structural and electrical safety standards.
  • DNO Notification: For systems larger than 3.68kW per phase, your installer must notify the Distribution Network Operator (DNO) before installation.

Your installer should handle these processes, though they may require some information or signatures from you.

Equipment Ordering and Scheduling

Once permissions are in place:

  • All necessary equipment is ordered
  • An installation date is scheduled (typically 2-8 weeks after contract signing, depending on complexity and equipment availability)
  • A detailed installation plan is developed

Phase 3: The Installation Process

The physical installation typically takes 1-3 days, depending on system size and complexity:

Day 1: Preparation and Mounting

The first day usually involves:

  • Setup: Arranging equipment, establishing a safe work area, and protecting your property
  • Scaffolding: Erecting secure access to your roof (typically set up a day before installation begins)
  • Mounting System: Installing the racking or mounting framework that will hold the solar panels

Day 1-2: Panel Installation

Once the mounting system is in place:

  • Solar panels are carefully lifted onto the roof
  • Each panel is secured to the mounting system
  • Panels are wired together in strings according to the system design

Day 2-3: Electrical Work

The electrical components are then installed:

  • Inverter Installation: Mounting and connecting the inverter(s) that convert DC electricity from the panels to AC electricity for your home
  • Battery Installation: If included, positioning and connecting the battery storage system
  • Electrical Connections: Running conduit and wiring from the panels to the inverter and from the inverter to your home's consumer unit
  • Metering: Installing monitoring systems to track energy production

Phase 4: Testing and Commissioning

After the physical installation is complete:

System Testing

  • Comprehensive testing of all electrical connections
  • Verification of proper grounding and safety systems
  • Performance testing of the entire system
  • Testing of monitoring systems and user interfaces

Final Inspection

Once testing is complete, a final inspection ensures:

  • All work meets regulatory requirements and industry standards
  • The installation is aesthetically acceptable
  • The site is clean and any temporary alterations to your property have been restored

Commissioning and Handover

The final stage includes:

  • System activation and connection to the grid
  • Comprehensive demonstration of how to operate and monitor your system
  • Provision of all system documentation, warranties, and maintenance information
  • Registration of your system with the Microgeneration Certification Scheme (MCS) if applicable
  • Setup of monitoring apps or portals

Phase 5: Post-Installation

Meter Registration

After installation:

  • You'll need to inform your electricity supplier about your new solar installation
  • In some cases, a new smart meter may need to be installed
  • You may need to register for the Smart Export Guarantee (SEG) to receive payments for exported electricity

System Monitoring and Maintenance

Modern solar systems require minimal maintenance, but it's good practice to:

  • Monitor system performance regularly through the provided app or portal
  • Schedule annual inspections to ensure optimal operation
  • Clean panels periodically if needed (though rain often provides sufficient cleaning in the UK climate)

Preparing for Your Installation: Practical Tips

To ensure your installation goes smoothly:

Before Installation Day

  • Clear access to your roof and electrical panel
  • Remove vehicles from the driveway or provide alternative parking for installers
  • Secure pets away from work areas
  • Clear valuables from areas where work will take place
  • Ensure the installation team has access to electrical outlets and water if needed

During Installation

  • You don't need to be present the entire time, but should be available for questions
  • Expect some noise during working hours
  • Your electricity may need to be turned off for short periods (typically less than an hour)

Common Questions and Concerns

Will the installation damage my roof?

A professional installation should not damage your roof. Experienced installers use specialized mounting systems designed to protect roof integrity while ensuring the solar array is securely attached.

What happens in bad weather?

Installations are typically rescheduled if severe weather is forecast. Light rain might delay but not necessarily cancel an installation day, while strong winds or heavy rain will likely result in rescheduling for safety reasons.

How disruptive is the installation process?

While there will be some noise and activity around your property, most homeowners find the process less disruptive than expected. The electrical work typically causes the most disruption but is usually limited to short periods.

Conclusion

Understanding the solar installation process helps set realistic expectations and ensures you're prepared for each stage. While every installation has unique aspects, this timeline provides a general framework for what to expect when transitioning to solar power.

At VopoKanonne Solar, we pride ourselves on transparent communication throughout the installation journey, ensuring you're informed and comfortable at every step. The result is a smooth transition to clean, renewable solar energy that will serve your home for decades to come.

Ready to start your solar installation journey?

Contact our team to schedule a free consultation and site assessment.

Get Started Today

Share this article: